Well structure optimisation for "T" prospect in the southeast area of Cuu Long basin, offshore Vietnam
Abstract
The paper listed and analysed the success as well as the typical complexities and failures encountered during the construction of wells T-1, T-2 and T-3 in T formation in the southeast area of Cuu Long basin, off shore Vietnam, which is managed by the Petrovietnam Domestic Exploration Production Operating Company Limited (PVEP POC). On that basis, the authors proposed remedial solutions and rationalised the structure for the wells in T formation. One of the proposed solutions is to adjust the depth of the 13⅜inch shoe casing to fi t the geological formation. This solution has been applied successfully to wells in Cuu Long basin.
References
2. Tập đoàn Dầu khí Việt Nam. Địa chất và Tài nguyên Dầu khí Việt Nam. Nhà xuất bản Khoa học và Kỹ thuật. 2007.
3. Hussian Rabia. Well engineering and construction. 2014.
4. Halliburton. Casing seat training manual. 2014.
5. Geoff Downton. Systems modeling and design of Automated-Directional-Drilling systems. SPE Drilling & Completion. 2015; 30(3).

1. The Author assigns all copyright in and to the article (the Work) to the Petrovietnam Journal, including the right to publish, republish, transmit, sell and distribute the Work in whole or in part in electronic and print editions of the Journal, in all media of expression now known or later developed.
2. By this assignment of copyright to the Petrovietnam Journal, reproduction, posting, transmission, distribution or other use of the Work in whole or in part in any medium by the Author requires a full citation to the Journal, suitable in form and content as follows: title of article, authors’ names, journal title, volume, issue, year, copyright owner as specified in the Journal, DOI number. Links to the final article published on the website of the Journal are encouraged.