Solutions to gas lift optimisation of oil wells with high water-cut in Cuu Long basin

  • Nguyen Hai An
Keywords: Gas lift, gas lift optimisation, wellhead platform, net cash flow, Cuu Long basin

Abstract

Artificial gas lift is frequently used in secondary recovery to boost the production rate of mature oil fields, especially in areas with high water-cut and suspended solids. The high water-cut of production stream may require large amount of gas for lifting a unit volume of crude. In addition, the production operation is costly because the ratios of water/oil become higher and oil production rates decline dramatically.
To maximise the economic return of oil production, it is important to into account the cost of lift gas injection (including recompression costs), the sale price of oil and gas, other production costs, the money discount rate and the rate of inflation. In this paper, the net cash flow of the field is maximised, then decisive parameters will be adjusted over the production life of the field by allocating the flow rate of injected gas to each production well.

References

Cao Ngọc Lâm. Công nghệ khai thác dầu khí. Đại học Mỏ - Địa chất. 2002.

Lê Xuân Lân, Ngô Hữu Hải, Nguyễn Hải An, Nguyễn Thế Vinh, Lê Huy Hoàng. Công nghệ mỏ dầu khí. Nhà xuất bản Khoa học Kỹ thuật. 2017.

N.Nishikiori, R.A.Redner, D.R.Doty, Z.Schmidt. An improved method for gas lift allocation optimization. SPE Annual Technical Conference and Exhibition, San Antonio, Texas. 8 - 11 October, 1989.

Hình 1. Tương quan giữa sản lượng chất lưu khai thác và lưu lượng khí nén
Published
2019-08-31
How to Cite
Nguyen Hai An. (2019). Solutions to gas lift optimisation of oil wells with high water-cut in Cuu Long basin. Petrovietnam Journal, 8, 29-36. Retrieved from https://pvj.vn/index.php/TCDK/article/view/361
Section
Articles