A study of appropriate solutions for construction and Installation of floating structures’ mooring system in Vietnam’s sea conditions

  • Pham Hien Hau
  • Nguyen Dat Thinh
Keywords: Floating structures, FPSO, mooring systems, construction solutions

Abstract

This paper presents the technologies applied in the construction and installation of mooring systems for floating structures in the world. Based on design solutions for the mooring systems, the existing infrastructure capacity, equipment and facilities in Vietnam and in the neighbouring countries, appropriate solutions have been developed for the construction and installation of floating structures’ mooring systems in Vietnam. It is then specifically applied on a floating production storage and offloading (FPSO) structure operating at Te Giac Trang field to evaluate the economic and technological efficiency.

References

1. Phạm Hiền Hậu. Luận chứng khoa học kỹ thuật và kinh tế phục vụ thiết kế xây dựng công trình biển nước sâu kiểu bể chứa nổi và rót dầu FSO/FPSO ở vùng nước sâu lựa chọn từ 150m - 500m, Thềm lục địa Việt Nam. Nhánh 5 - Đề
tài NCKH cấp Nhà nước KC.09.15/06-10. 2009.
2. Phạm Hiền Hậu, Nguyễn Đạt Thịnh. Nghiên cứu xây dựng giải pháp thi công hợp lý để lắp đặt hệ thống neo giữ các công trình biển nổi trong điều kiện biển Việt Nam. Báo cáo tổng quan đề tài khoa học và công nghệ cấp cơ sở.
81-2015/KHXD. 2015.
3. API RP 2SK 3rd edition. Recommended practice for design and analysis of stationkeeping systems for floating structures. American Petroleum Institute (API). 2005.
4. Nguyễn Ngọc Vinh, Đinh Khắc Minh, Nguyễn Tất Hoàn, Nguyễn Văn Điệp. Lựa chọn giải pháp đóng mới và hoán cải các kho chứa nổi cho các mỏ khai thác dầu khí trên thềm lục địa Việt Nam. Tạp chí Dầu khí. 2013; 3: trang 51 - 61.
5. Tạp chí Khoa học Công nghệ Hàng hải số 14 tháng 6/2008.
6. Huailiang Li, Yongxin Chen, Weiwei Xie, Shihui Xue, Chen He, Alan M.Wang. Installation of STP Mooring System and FPSO Hookup. International Offshore and Polar Engineering Conference Beijing, China. 20 - 25 June, 2010.
7. ABS. Guide for building and classing floating production installations. American Bureau of Shipping Incorporated by Act of Legislature of the State of New York. 1862.
8. DNV. Positioning mooring. Ofshore standard DNVOS-301. Det Norske Veritas. 2001.
9. DNV. DNV Rules for marine operations. Det Norske Veritas.
10. Genesis Oil & Gas Consultant Ltd. Geotechnical parameter review for TGT studies.
11. UMW. Deepnautic proposal for transport, installation & hook up of TGT FPSO.