Predicting water influx for gas production wells of Lan Do field using material balance method

  • Ung Vu Duc
  • Quan Le Vu
  • Thinh Nguyen Van
  • Truong Trieu Hung
Keywords: Lan Do field, water influx, water-gas ratio, gas-water contact

Abstract

Lan Do gas field (Block 06-1 in Nam Con Son basin) started producing gas and condensate in October 2012. The cumulative production up to February 2018 was 6,854 billion cubic metres of gas and 0.09 million barrels of condensate which account for 62% and 41% of the reserve, respectively. At present, there is no water influx phenomenon in Lan Do production wells. However, it is necessary to forecast water influx period for reservoir production and management strategies. This paper analyses and forecasts this phenomenon for the production wells of Lan Do field and proposes optimal production strategy.

References

1. Viện Dầu khí Việt Nam. Nghiên cứu phục vụ quản lý khai thác các mỏ dầu khí do nhà thầu nước ngoài điều hành tại Việt Nam. 2017.
2. Hoang Vu Nam. Block 06.1 PSC monthly production report. Rosneft Vietnam. 2018.
3. Nguyen Tuan Anh. Block 06-1 production quarterly review with PVN. Rosneft Vietnam. 2018.
4. B.C.Craft, M.F.Hawkins. Applied petroleum reservoir engineering (2nd edition). 1991.
5. BP Oil Company. Block 06-1 Lan Tay - Lan Do development plan. 2008.