Predicting water influx for gas production wells of Lan Do field using material balance method
Abstract
Lan Do gas field (Block 06-1 in Nam Con Son basin) started producing gas and condensate in October 2012. The cumulative production up to February 2018 was 6,854 billion cubic metres of gas and 0.09 million barrels of condensate which account for 62% and 41% of the reserve, respectively. At present, there is no water influx phenomenon in Lan Do production wells. However, it is necessary to forecast water influx period for reservoir production and management strategies. This paper analyses and forecasts this phenomenon for the production wells of Lan Do field and proposes optimal production strategy.
References
2. Hoang Vu Nam. Block 06.1 PSC monthly production report. Rosneft Vietnam. 2018.
3. Nguyen Tuan Anh. Block 06-1 production quarterly review with PVN. Rosneft Vietnam. 2018.
4. B.C.Craft, M.F.Hawkins. Applied petroleum reservoir engineering (2nd edition). 1991.
5. BP Oil Company. Block 06-1 Lan Tay - Lan Do development plan. 2008.
1. The Author assigns all copyright in and to the article (the Work) to the Petrovietnam Journal, including the right to publish, republish, transmit, sell and distribute the Work in whole or in part in electronic and print editions of the Journal, in all media of expression now known or later developed.
2. By this assignment of copyright to the Petrovietnam Journal, reproduction, posting, transmission, distribution or other use of the Work in whole or in part in any medium by the Author requires a full citation to the Journal, suitable in form and content as follows: title of article, authors’ names, journal title, volume, issue, year, copyright owner as specified in the Journal, DOI number. Links to the final article published on the website of the Journal are encouraged.