Predicting water influx for gas production wells of Lan Do field using material balance method
Tóm tắt
Lan Do gas field (Block 06-1 in Nam Con Son basin) started producing gas and condensate in October 2012. The cumulative production up to February 2018 was 6,854 billion cubic metres of gas and 0.09 million barrels of condensate which account for 62% and 41% of the reserve, respectively. At present, there is no water influx phenomenon in Lan Do production wells. However, it is necessary to forecast water influx period for reservoir production and management strategies. This paper analyses and forecasts this phenomenon for the production wells of Lan Do field and proposes optimal production strategy.
Các tài liệu tham khảo
2. Hoang Vu Nam. Block 06.1 PSC monthly production report. Rosneft Vietnam. 2018.
3. Nguyen Tuan Anh. Block 06-1 production quarterly review with PVN. Rosneft Vietnam. 2018.
4. B.C.Craft, M.F.Hawkins. Applied petroleum reservoir engineering (2nd edition). 1991.
5. BP Oil Company. Block 06-1 Lan Tay - Lan Do development plan. 2008.
1. Tác giả giao bản quyền bài viết (tác phẩm) cho Tạp chí Dầu khí, bao gồm quyền xuất bản, tái bản, bán và phân phối toàn bộ hoặc một phần tác phẩm trong các ấn bản điện tử và in của Tạp chí Dầu khí.
2. Bằng cách chuyển nhượng bản quyền này cho Tạp chí Dầu khí, việc sao chép, đăng hoặc sử dụng một phần hay toàn bộ tác phẩm nào của Tạp chí Dầu khí trên bất kỳ phương tiện nào phải trích dẫn đầy đủ, phù hợp về hình thức và nội dung như sau: tiêu đề của bài viết, tên tác giả, tên tạp chí, tập, số, năm, chủ sở hữu bản quyền theo quy định, số DOI. Liên kết đến bài viết cuối cùng được công bố trên trang web của Tạp chí Dầu khí được khuyến khích.